Crantock Village Hall with solar panels on the roof and its car park

    Case study · Crantock Village Hall, Cornwall

    A village hall that earns money while it's locked.

    Solar, battery and two public EV chargers, run end to end by Manta Power. Here's what the last 12 months looked like.

    £1,614

    profit to the hall from charging

    306

    charging sessions

    8,261

    kWh delivered to drivers

    0 hrs

    volunteer time needed

    The year in numbers

    Where the money goes

    Charging income to the hall
    £3,844
    Electricity used (8,261 kWh at 27p)
    −£2,230
    Profit to the hall
    £1,614

    A 42% margin on the electricity sold.

    Up on year one

    +91%

    charging sessions

    +79%

    energy delivered

    +73%

    annual profit

    Compared with the yearly average from Feb 2024 to Oct 2025.

    Charging income to the hall, month by month

    £ before electricity costs

    Summer brings two thirds of the year's sessions. August alone earned £760. October 2025 runs from the 13th and October 2026 to the 8th.

    27 kWh

    average top-up, about 95 miles of driving

    4–7pm

    busiest time, with a third of all sessions

    28,900

    miles of electric driving, about 4.5 tonnes of CO₂ saved

    Installed May 2023

    How it all fits together

    8.46 kW

    solar array on the roof

    10.5 kWh

    battery storage

    10 kW

    Solis 3-phase hybrid inverter

    2 × 22 kW

    Autel public EV chargers

    What happens day to day

    1. 1Solar panels power the hall and top up the battery during the day.
    2. 2Drivers plug in and pay by app or card. No staff, no cash, no keys.
    3. 3Manta Power monitors the chargers, handles driver support and fixes faults remotely.
    4. 4The income lands in the hall's account, with a monthly report.

    Pricing that works for the village

    Visitors45p / kWh
    Regular users40p / kWh
    Local residents35p / kWh
    Hall's electricity cost27p, fixed to Dec 2027

    An idle fee stops cars sitting in the bays once they're full, which also adds a little extra income.

    £28,662

    total install, part grant funded

    ~£2,685 a year

    charging profit plus an estimated £1,071 in solar savings

    ~11 years

    simple payback, down from 14. Panels last 25+ years

    Could your hall be next?

    Income that doesn't need volunteers

    The chargers earn day and night, even when the hall is shut. Trustees don't lift a finger.

    Lower bills on top

    Solar and a battery cut what the hall pays for its own power.

    Something the village uses

    Residents get a cheaper local rate, and visitors have a reason to stop in the village.

    Proven, not a punt

    Crantock is one of three village halls where we run the EV charging, and we'd like to add more.

    How we get you there

    1. 1. Free site visit

      We look at your car park, roof and bills.

    2. 2. Grants sorted

      We find the funding and help with the paperwork.

    3. 3. Installed

      Certified local installers, minimal disruption.

    4. 4. Fully managed

      Payments, support and reports handled.

    The EV charging grant closes in March 2027

    Talk to Matt at Manta Power

    Free site visit for village halls and community buildings in Cornwall and Devon.

    Download the PDF

    Based on real Crantock Village Hall data, 13 Oct 2025 to 8 Oct 2026. Results at other sites will depend on location, use and energy tariff.