    EV Charging Standards in the UK: The Rules Your Holiday Let Charger Must Meet

    November 13, 2026
    8 min read
    EV Charging Standards in the UK: The Rules Your Holiday Let Charger Must Meet

    The short answer

    A holiday let EV charger in the UK has to meet three sets of rules: the Electric Vehicles (Smart Charge Points) Regulations 2021 (the charger itself must be smart), the wiring standard BS 7671 with the IET Code of Practice (how it's installed), and the local network operator's notification rules (telling the DNO it's there). If you want the Workplace Charging Scheme grant, the charger must also be an OZEV-approved model fitted by an OZEV-authorised installer. Most of this is the installer's job, but you should know what to ask for.

    Why EV charging standards matter for a holiday let

    At home, a charger mostly affects you. At a holiday let, it's used by strangers, in all weathers, often late at night after a long drive down the A30. If it's badly fitted, the risk sits with you as the owner, and so does the awkward phone call when it doesn't work.

    Knowing the standards also helps you spot a cheap quote that cuts corners. A price that skips the earthing checks, the DNO notification or the certificate isn't a bargain.

    The EV charging standards at a glance

    Standard or ruleWhat it coversWho deals with it
    Smart Charge Points Regulations 2021The charger must be smart, metered and secureManufacturer and seller
    BS 7671 (Section 722)How the circuit and earthing are wiredYour electrician
    IET Code of Practice for EV charging (5th edition)Detailed installation good practiceYour electrician
    Building Regulations Part PElectrical work is certified and notifiedElectrician via a competent person scheme
    DNO notificationThe network operator is told about the new loadYour installer
    Workplace Charging Scheme rulesApproved model, authorised installer, apply firstYou and your installer

    Smart charge point rules: what the 2021 regulations require

    Since 30 June 2022, any charger sold for home or workplace use in Great Britain must meet the Electric Vehicles (Smart Charge Points) Regulations 2021. They don't cover public or rapid (50kW+) chargers. According to the GOV.UK guidance, the duty falls on whoever sells the charger, not on you as the owner, so any new charger from a reputable supplier should already comply.

    What a compliant charger must do:

    • Be smart. It must connect to the internet and be able to change when and how fast it charges.
    • Keep working if you switch energy supplier. It can't lose its smart features because you've changed tariff.
    • Still charge if the Wi-Fi drops. Loss of signal must not stop a guest charging.
    • Measure the energy used. It must record kWh and charging time per session, by month and over 12 months. That metering is what makes guest-pay charging possible.
    • Meet security rules. Unique passwords, encrypted communications and software that can be updated securely.

    The default off-peak hours, and why they matter for guests

    The regulations also require chargers to come with pre-set default charging hours outside peak times. Peak is defined as 8am to 11am and 4pm to 10pm on weekdays. There's also a random start delay of up to 10 minutes (600 seconds) by default.

    At home that's handy. At a holiday let, it can catch a guest out: they arrive at 6pm on a Friday, plug in, and nothing happens until 10pm. The owner can accept, change or remove the default hours when the charger is set up, and change them later. Decide this before your first guest arrives. Most owners either remove the default hours so guests can charge on arrival, or keep them and explain in the welcome guide.

    Installation standards: BS 7671 and the IET Code of Practice

    The wiring has to meet BS 7671, the UK wiring regulations. Section 722 deals with EV charging specifically. The IET's Code of Practice for Electric Vehicle Charging Equipment Installation, now in its fifth edition, adds detailed guidance.

    In practice, a proper installation includes:

    1. A load check on your supply, so the charger, the kettle, the oven and the hot tub can all run without tripping the main fuse.
    2. A dedicated circuit with the right protection, including RCD protection.
    3. Earthing arrangements that deal with the risk of a broken neutral (PEN fault). Many modern chargers have this protection built in, which avoids the need for an earth rod.
    4. Testing and an Electrical Installation Certificate for your records.

    Keep that certificate with your holiday let paperwork. Your insurer or letting agent may ask for it.

    Building Regulations and DNO notification

    In England, a new circuit for an EV charger is notifiable electrical work under Part P of the Building Regulations. An electrician registered with a competent person scheme (such as NICEIC or NAPIT) can self-certify the work, so you don't need to contact Building Control yourself.

    The DNO (distribution network operator) also needs to know. In Cornwall and Devon that's National Grid Electricity Distribution. Under the Energy Networks Association process, a standard 7kW home charger is usually a "connect and notify" job: the installer fits it, then tells the DNO. Bigger loads, or properties with an old looped supply, may need an "apply to connect" application first, which can add a few weeks. Your installer should check this at survey stage, especially in rural Cornwall where single-phase supplies are common.

    Extra checks if you're using the Workplace Charging Scheme

    Holiday lets count as small accommodation businesses under the OZEV Workplace Charging Scheme, which pays up to 75% of costs, capped at £500 per socket, until the scheme closes on 31 March 2027. There's no minimum number of parking spaces. To qualify:

    • Apply for your voucher before the charger is fitted. Installations completed before a voucher is issued can't be claimed.
    • Choose an approved model. The charger must be on OZEV's approved chargepoint model list at the time of installation.
    • Use an OZEV-authorised installer. Only authorised installers can redeem the voucher.
    • Own the property or have landlord consent, with off-street parking that belongs to the let.

    You apply for the voucher yourself on GOV.UK. We walk you through each question, and our installation partners are OZEV-authorised.

    Does a holiday let charger count as a public charge point?

    Normally, no. A charger for your staying guests is a private charger at your property, so the smart charge point rules above apply. If you open it to passing drivers who aren't staying with you, different rules (the Public Charge Point Regulations 2023) can apply. Talk to your installer before you advertise it to the public.

    What the standards mean for running costs

    The metering required by the smart rules is what lets guests pay fairly for what they use. Typical figures:

    Price per kWh
    Standard electricity tariffAbout 25–28p
    Overnight off-peak EV tariffAbout 7–9p
    Fair price to charge guests35–45p

    The charger records each session, and the guest pays through an app or QR code. That's only possible because of the metering the smart rules require.

    FAQ

    What are the main EV charging standards in the UK? For a home or holiday let charger, the main ones are the Electric Vehicles (Smart Charge Points) Regulations 2021, BS 7671 Section 722 and the IET Code of Practice for EV charging installation. Part P of the Building Regulations and DNO notification also apply.

    Do I have to make sure my charger meets the smart charge point regulations? The legal duty falls on the seller, not the owner. Buy a new charger from a reputable supplier and it should comply. Old or second-hand units sold before 30 June 2022 may not.

    Why won't my guest's car charge in the early evening? It's probably the default off-peak hours, which block charging from 4pm to 10pm on weekdays unless they're removed or overridden. You can change or remove them in the charger's app.

    Does the DNO need to know about my EV charger? Yes. Your installer notifies the DNO, usually after fitting a standard 7kW charger. Larger installations may need approval first.

    Can any electrician fit a grant-funded charger? No. For the Workplace Charging Scheme, the installer must be OZEV-authorised and the charger must be on the approved model list.


    Want a holiday let charger that ticks every box? Manta Power arranges smart, guest-pay chargers for holiday let owners across Cornwall, Devon and the South West, fitted by our local installation partners. See the holiday let offer, work out your earnings with our calculator, or call 07441 353701.